Assessing the job
Preparing to lift the back piece - 120kg of concrete - in to place.
Manoevering the back piece on dowling rods
laying the insulation
Scaring the small children who are safely imprisoned inside
laying the jigsaw of tiles
The Great Escape
Freedom!
Applying the stainless steal piece at the front
Beer o'clock - having applied clay sealant to the pieces so that the heat is locked in
look no hands!
Baby Matthew - Gill's second (third? I've no idea how this works) cousin
The wine cellar
The next day: applying chicken wire over the tin foil, which is wrapped over the insulation, which is wrapped over the outside of the oven.
Wrapping the chicken wire over the foil - one of the hardest stages of the construction
Fitting the flue in to place
The next stage is the rendering of the oven, followed by..... PIZZA!